JAD-15005_FEED

PROJECT OVERVIEW

PROJECT NO JAD 15005
CLIENT ADNOC ONSHORE (ADCO)
Client Contract No 15348.01 TASK ORDER NO. 92346565 (GES 2012-2015)
MAN-HOURS 29,260
PROJECT TITLE FEED FOR BUHASA PRODUCED WATER RE-INJECTION (PWRI) PROJECT
SCOPE OF WORK Engineering, EPC Cost Estimation & EPC Tender Package
BRIEF SCOPE OF WORK & LIST OF DELIVERABLES
PROEJCTS :- EPC TENDER PACKAGE, EPC SCOPE OF WORK, PROJECT DESIGN BASIS, COST ESTIMATE METHODOLOGY, COST ESTIMATE REPORT, OPTION SELECTION STUDY REPORT, SITE VISIT REPORTs
PROCESS:- LINE SCHEDULE, EQUIPMENT SCHEDULE, PROCESS DESCRIPTION, STEADY STATE HYDRAULIC CALCULATION REPORT, SURGE ANALYSIS REPORT, UTILITY CALCULATION REPORT, DYNAMIC SIMULATION STUDY REPORT, ISOLATION, VENT AND DRAIN PHILOSOPHY, OPERATING AND CONTROL PHILOSOPHY, PRE-COMMISSIONING AND COMMISSIONING PHILOSOPHY, TIE-IN PHILOSOPHY
PIPING /PIPELINE  :- MTO FOR PIPING BULK, PIPING TIE-IN SCHEDULE, PIPING MATERIAL SPECIFICATION, SPECIFICATIONS FOR SEAMLESS LINE PIPE,  SUBMERGED ARC WELDED LINE PIPE, PIPELINE VALVES, LINEPIPE INDUCTION BENDS, BARRED TEES, PIPELINE ISOLATION JOINTS, PIPELINE FLANGES AND FITTINGS, EXTERNAL COATING FOR BURIED PIPELINE AND FLOWLINES, PIPELINE WELDING AND NDT, PIPELINE HYDROSTATIC PRESSURE TESTING, PIPELINE CROSSING SCHEDULE, DATA SHEETS FOR LINE PIPE, VALVES, BENDS, TEES, VALVES AND SPECILAITY ITEMS. MATERIAL REQUISITION FOR LINE PIPE, VALVES, BENDS, TEES, VALVES AND SPECILAITY ITEMS,  PIPING ,PIPELINE STRESS ANALYSIS REPORT, PIPING FLEXIBILITY ANALYSIS REPORT
MATERIAL & CORROSION :- MATERIAL SELECTION & CORROSION CONTROL PHILOSOPHY, CATHODIC PROTECTION PHILOSOPHY REPORT, CATHODIC PROTECTION SPECIFICATION, MATERIAL SELECTION REPORT, CATHODIC PROTECTION CALCULATIONS
MECHANICAL :- DATA SHEETS FOR CORROSION INIBITOR INJECTION PACKAGE, OXYGEN SCAVENGER INJECTION PACKAGE, MATERIAL REQUISITION FOR CHEMICAL INJECTION PACKAGE, OXYGEN SCAVENGER INJECTION PACKAGE
CIVIL:- MATERIAL TAKE OFF , PIPE SUPPORTS,
ELECTRICAL :- TIE-IN SCHEDULE, MTO FOR ELECTRICAL BULK MATERIAL, CABLE SCHEDULE, EQUIPMENT SCHEDULE, JUNCTION BOX SCHEDULE, LIGHTING CALCULATION, SPECIFICATIONS, DATA SHEETS AND MR’S  FOR LV POWER, CONTROL AND EARTHING CABLES, MOV POWER DISTRIBUTION BOARD, FOR ELECTRICAL BULK MATERIALS, ELECTRICAL LOAD LIST, POWER SYSTEM ADEQUACY CHECK REPORT, CABLE SIZING CALCULATION
TELECOMMUNICATION:- SPECIFICATIONS, DATA SHEETS, & MR’S  FOR CCTV SYSTEM,PA, TELEPHONE FOC,CCTV, MTO. CABLE SCHEDULE, JUNCTION BOX SCHEDULE
INSTRUMENTATION & CONTROL:- INSTRUMENT INDEX, I/O LIST, ALARM & TRIP SCHEDULE, SPECIFICATIONS, DATA SHEETS, & MR’S  FOR ONLINE WATER ANALYZER, MOTOR OPERATED VALVES, CONTROL VALVE, OXYGEN ANALYZER, PRESSURE GAUGE, PRESSURE TRANSMITTER, FLOW TRANSMITTER , MTO, SOW FOR EXISTING DCS / RTU SYSTEM MODIFICATION
HSE :- HSE PLAN, HSE PHILOSOPHY, HAZARDOUS ARE CLASSIFICATION SCHEDULE, PLOT PLAN REVIEW AND CLOSE-OUT REPORT, SAFETY EQUIPMENT DATA SHEET SAFETY SHOWER AND EYEWASH STATION, HSE ACTION TRACKING REGISTER, SOW FOR HAZOP, HAZID & SIMOPS, PHSER, CONSTRUCTABILITY Review AND CLOSE OUT REPORTS.
  • Project Name FEED FOR BUHASA PRODUCED WATER RE-INJECTION (PWRI) PROJECT
  • Client ADNOC ONSHORE (ADCO)
  • Category FEED & DETAIL ENGINEERING
  • Location Iraq (Offshore)