PROJECT NO |
JAD 15005 |
CLIENT |
ADNOC ONSHORE (ADCO) |
Client Contract No |
15348.01 TASK ORDER NO. 92346565 (GES 2012-2015) |
MAN-HOURS |
29,260 |
PROJECT TITLE |
FEED FOR BUHASA PRODUCED WATER RE-INJECTION (PWRI) PROJECT |
SCOPE OF WORK |
Engineering, EPC Cost Estimation & EPC Tender Package |
BRIEF SCOPE OF WORK & LIST OF DELIVERABLES |
PROEJCTS :- EPC TENDER PACKAGE, EPC SCOPE OF WORK, PROJECT DESIGN BASIS, COST ESTIMATE METHODOLOGY, COST ESTIMATE REPORT, OPTION SELECTION STUDY REPORT, SITE VISIT REPORTs |
PROCESS:- LINE SCHEDULE, EQUIPMENT SCHEDULE, PROCESS DESCRIPTION, STEADY STATE HYDRAULIC CALCULATION REPORT, SURGE ANALYSIS REPORT, UTILITY CALCULATION REPORT, DYNAMIC SIMULATION STUDY REPORT, ISOLATION, VENT AND DRAIN PHILOSOPHY, OPERATING AND CONTROL PHILOSOPHY, PRE-COMMISSIONING AND COMMISSIONING PHILOSOPHY, TIE-IN PHILOSOPHY |
PIPING /PIPELINE :- MTO FOR PIPING BULK, PIPING TIE-IN SCHEDULE, PIPING MATERIAL SPECIFICATION, SPECIFICATIONS FOR SEAMLESS LINE PIPE, SUBMERGED ARC WELDED LINE PIPE, PIPELINE VALVES, LINEPIPE INDUCTION BENDS, BARRED TEES, PIPELINE ISOLATION JOINTS, PIPELINE FLANGES AND FITTINGS, EXTERNAL COATING FOR BURIED PIPELINE AND FLOWLINES, PIPELINE WELDING AND NDT, PIPELINE HYDROSTATIC PRESSURE TESTING, PIPELINE CROSSING SCHEDULE, DATA SHEETS FOR LINE PIPE, VALVES, BENDS, TEES, VALVES AND SPECILAITY ITEMS. MATERIAL REQUISITION FOR LINE PIPE, VALVES, BENDS, TEES, VALVES AND SPECILAITY ITEMS, PIPING ,PIPELINE STRESS ANALYSIS REPORT, PIPING FLEXIBILITY ANALYSIS REPORT |
MATERIAL & CORROSION :- MATERIAL SELECTION & CORROSION CONTROL PHILOSOPHY, CATHODIC PROTECTION PHILOSOPHY REPORT, CATHODIC PROTECTION SPECIFICATION, MATERIAL SELECTION REPORT, CATHODIC PROTECTION CALCULATIONS |
MECHANICAL :- DATA SHEETS FOR CORROSION INIBITOR INJECTION PACKAGE, OXYGEN SCAVENGER INJECTION PACKAGE, MATERIAL REQUISITION FOR CHEMICAL INJECTION PACKAGE, OXYGEN SCAVENGER INJECTION PACKAGE |
CIVIL:- MATERIAL TAKE OFF , PIPE SUPPORTS, |
ELECTRICAL :- TIE-IN SCHEDULE, MTO FOR ELECTRICAL BULK MATERIAL, CABLE SCHEDULE, EQUIPMENT SCHEDULE, JUNCTION BOX SCHEDULE, LIGHTING CALCULATION, SPECIFICATIONS, DATA SHEETS AND MR’S FOR LV POWER, CONTROL AND EARTHING CABLES, MOV POWER DISTRIBUTION BOARD, FOR ELECTRICAL BULK MATERIALS, ELECTRICAL LOAD LIST, POWER SYSTEM ADEQUACY CHECK REPORT, CABLE SIZING CALCULATION |
TELECOMMUNICATION:- SPECIFICATIONS, DATA SHEETS, & MR’S FOR CCTV SYSTEM,PA, TELEPHONE FOC,CCTV, MTO. CABLE SCHEDULE, JUNCTION BOX SCHEDULE |
INSTRUMENTATION & CONTROL:- INSTRUMENT INDEX, I/O LIST, ALARM & TRIP SCHEDULE, SPECIFICATIONS, DATA SHEETS, & MR’S FOR ONLINE WATER ANALYZER, MOTOR OPERATED VALVES, CONTROL VALVE, OXYGEN ANALYZER, PRESSURE GAUGE, PRESSURE TRANSMITTER, FLOW TRANSMITTER , MTO, SOW FOR EXISTING DCS / RTU SYSTEM MODIFICATION |
HSE :- HSE PLAN, HSE PHILOSOPHY, HAZARDOUS ARE CLASSIFICATION SCHEDULE, PLOT PLAN REVIEW AND CLOSE-OUT REPORT, SAFETY EQUIPMENT DATA SHEET SAFETY SHOWER AND EYEWASH STATION, HSE ACTION TRACKING REGISTER, SOW FOR HAZOP, HAZID & SIMOPS, PHSER, CONSTRUCTABILITY Review AND CLOSE OUT REPORTS. |