JAD-14002_FEED

PROJECT OVERVIEW

PROJECT NO JAD 14002
CLIENT ADNOC GAS PROCESSING (GASCO)
Client Contract No PROJECT NO.600512  (GES 2012-2015)
MAN-HOURS 5950
PROJECT TITLE UPGRADING OF SUBSTATION·19 AT MAQTA FEED AND DETAIL STUDY-SS·19
SCOPE OF WORK FEED ENGINNERING FOR UPGRADTION OF SUBSTATION AT MAQTA, EPC COST ESTIMATION, EPC SCOPE OF WORK, EPC TENDER PACKAGE
BRIEF SCOPE OF WORK & LIST OF DELIVERABLES
GENERAL

EPC COST ESTIMATE REPORT

EPC SCOPE OF WORK

EPC TENDER PACKAGE

PROJECT DESIGN BASIS

PROJECT DEFINITION REPORT

PROJECT SPECIFICATIONS ADDENDUMS

ADEQUACY CHEQYE REPORTS FOR SUB STATION

SUB STATIONS  LAY OUT DARWINGS

SPECIFICATION, DATA SHEETS, MR’S FOR HV/ LV CABLES, UPS, MV/LV SWITCH GEARS

ELECTRICAL LOAD LIST, SLD, MTO, SCHEDULES

HEAT DISSPIATION , POWER SYSTEM STUDY REPORTS

HSE PLAN, HSE PHIOLOSOPHY,

HAZID /ENVID/ OHRA SCOPE OF WORK

HAZID /ENVID/ OHRA CLOSE-OUT REPORT

CONSTRUCTABILITY REVIEW

HAZARDS & EFFECTS REGISTER

HVAC COOLING LOAD CALCULATIONS

SPECIFICATION ADDENDUM HVAC DUCTWORK AND INSULATION

HVAC COOLING LOAD CALCULATIONS

HVAC CONTROL SYSTEMS SPECIFICATIONS

SUBSTATION-19 HVAC SCHEMATIC DIAGRAM

HVAC COOLING LOAD CALCULATIONS

HVAC CONTROL SYSTEMS SPECIFICATIONS

HVAC TESTING, ADJUSTING & BALANCING (TAB) SPECIFICATIONS

INSTRUMENT INDEX, I/O LIST, ALARM & TRIP SCHEDULE,

SPECIFICATIONS, DATA SHEETS, & MR’S  FOR FOC , CABLES, JUNCTION BOX , FIRE AND GAS DEVICES,

FIRE ALARM SYSTEM ARCHITECTURE DRAWING, FIRE & GAS CABLE BLOCK DIAGRAM

SCOPE OF WORK FOR MODIFICATION OF SMC SYSTEM

F&G INSTRUMENT INDEX

  • Project Name UPGRADING OF SUBSTATION•19 AT MAQTA FEED AND DETAIL STUDY-SS•19
  • Client ADNOC GAS PROCESSING (GASCO)
  • Category FEED & DETAIL ENGINEERING